1

High-Efficiency 400 kW Chiller Installation Achieves £50K Annual Cost Reduction on Energy and 200 Metric Tonnes CO₂ Cut

News Discuss 
Installation Overview At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the timely realisation of the project. This initiative supports a strategic step forward in the client’s ESG agenda, enhancing process stability and achieving measurable decreases in both energy demand and carbon footprint. https://greatbookmarking.com/story20749929/high-efficiency-400-kw-chiller-installation-achieves-50k-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story