Installation Overview At a prominent confectionery site in York, Newsome has commissioned a efficient 400 kW chiller, marking the successful conclusion of the project. This initiative demonstrates a notable step forward in the client’s ESG commitments, enhancing operational resilience and ensuring measurable reductions in both energy consumption and carbon emissions. https://newsome.ltd.uk/case-studies/high-efficiency-400-kw-chiller-installation-delivers-50000-annual-energy-savings-and-200-tonnes-co%e2%82%82-reduction/