As viewed within the figure under, steady auger is accustomed to drill the borehole, carry up drilled soil, and pour concrete when the auger is moved up. As a result, the borehole will not need casing or hydrostatic strain to stop damage to the borehole wall. The usage of a https://cast-in-situ-piles93703.acidblog.net/63732799/what-does-cast-in-situ-piles-mean