3. After rig positioning, drive the casing into the bottom. Generate metal casing to your minimum a depth of 1 m beneath the ground amount to consider lateral masses and actions at internet site. The metal casing also beat difficulties due to groundwater through piling. The withdrawn tube is equipped https://marlonw692owd5.blogitright.com/profile